Latest in AI
PartGenie 2.0: How to Review an AI-Suggested BOM Substitute
Use the new hardware workspace to find alternatives, then verify one part before taking the design to quotes or assembly.
PartGenie 2.0 brings component research, bill-of-materials analysis and manufacturing preparation into one hardware workspace. The November 25 launch describes datasheet-backed research, alternatives, electronic CAD files and sourcing. If you are trying it on a board, start with one out-of-stock part and see whether the information is good enough for someone to approve a replacement.
A bill of materials, or BOM, is the list of parts that actually has to be bought and assembled. A search tool can find a candidate that looks close. It is still your job to check that the proposed manufacturer part number can do the same work in your particular circuit.
Give the tool a clean input
Try a small, non-confidential sample, such as a temperature logger for a desk. Include the manufacturer part number, quantity and the design reference for each line in the BOM. Mark the original part whose availability is the problem. The PartGenie website lists spreadsheet and PDF upload for BOMs and separate Gerber upload for PCB fabrication and assembly quotes, with up to 25 MB for BOM/PDF files and up to 50 MB for Gerbers. You don't need Gerber files to check a part-level recommendation.
For a production design, send only files the team has approved to share. Start with component data, and determine who receives design files before moving into quoting.
Separate functional, footprint and supply checks
For a hypothetical replacement sensor, verify the operating limits and interface in the manufacturer's current datasheet before comparing price. Check the exact suffix, package dimensions and pinout against the schematic and land pattern. Two parts can fit the same nominal package size while assigning power or data to different pins. A model that fits in the CAD library is also not evidence that a distributor has the exact suffix in stock.
Then check inventory, lead time and pack size from the supplier you actually intend to use. Document the source and date on that BOM row. Compare only alternatives that pass the engineering requirements, and note any one that needs a board change rather than treating it as a drop-in.
Keep quotes and release review separate
A quotation is useful after the candidate part and file revision are agreed. Use a copy of the BOM tied to one design revision, compare proposed parts line by line, and mark changes for a reviewer. Don't use lower unit price as the score if a substitute forces a redesign or doesn't meet the build schedule.
The test passes if PartGenie gets you to a shortlist with evidence you can check faster. Your final approved BOM should still say exactly why each replacement is usable.
I'm Paras. I help AI and engineering teams explain technical products.
I write guides that connect new capabilities to the decisions customers actually need to make.